To prepare for a garage epoxy installation, remove vehicles, belongings, and other obstacles from the garage so the crew has full access to the floor. We'll explain any additional requirements before work begins.
Clear the floor completely
Vehicles, storage, tools, and anything sitting on the floor generally need to be removed before work begins. The crew needs the entire surface accessible for preparation and coating.
Plan where things will go for the duration — a driveway, a neighbor's garage, or temporary storage all work.
Plan for the timeline
Installation time depends on surface preparation, the coating system, and curing conditions. We'll discuss the expected timeline and when your floor can safely be used before work begins.
Georgia's heat and humidity play a role in curing conditions, which is one more reason to work with a local company that plans around them.
Questions? Ask before day one
If anything about preparation is unclear, ask during the estimate. Clear expectations and professional communication are how we run every project.
Learn about our epoxy flooring service, and Ready to talk about your project? Call K&P Remodeling at (470) 347-3144 or request a free estimate. Family-owned and serving Georgia since 2019 — 10% off for veterans.
Frequently asked questions
Do I have to empty the whole garage?
Generally yes — vehicles, belongings, and other obstacles need to be removed so the entire floor can be prepared and coated.
When can I park on the new floor?
It depends on the coating system and curing conditions. We'll tell you the expected timeline before work begins.

